The Deerfoot Trail construction project is a significant infrastructure development in Calgary, Alberta, Canada, aimed at improving traffic flow and reducing congestion on one of the city's major highways. Deerfoot Trail, also known as Alberta Highway 2, is a critical transportation artery that connects the city of Calgary to the surrounding municipalities and provinces. The construction project, which began in 2020, involves upgrading and expanding the existing highway to meet the growing demands of the region's population and economy.
The project's scope includes the construction of new lanes, interchanges, and bridges, as well as the rehabilitation of existing infrastructure. The upgrades are designed to improve traffic safety, reduce travel times, and increase the overall capacity of the highway. The project is being led by the Government of Alberta, in partnership with the City of Calgary and other stakeholders, and is expected to be completed in several phases over the next few years.
Project Overview

The Deerfoot Trail construction project is a complex and multifaceted initiative that involves various components, including road widening, interchange upgrades, and bridge construction. The project’s goal is to enhance the safety and efficiency of the highway, while also reducing congestion and improving air quality. The upgrades will include the addition of new lanes, improved lighting and signage, and enhanced drainage systems.
The project's design and construction are being carried out by a team of experienced engineers, contractors, and project managers. The team is working closely with local residents, businesses, and stakeholders to minimize disruptions and ensure that the project is completed on time and within budget. The project's progress is being monitored and reported regularly, with updates available on the Government of Alberta's website and social media channels.
Key Components
The Deerfoot Trail construction project involves several key components, including:
- Road widening: The project involves widening the existing highway to add new lanes and improve traffic flow.
- Interchange upgrades: The project includes upgrading several interchanges along the highway to improve safety and reduce congestion.
- Bridge construction: The project involves constructing new bridges and rehabilitating existing ones to improve traffic flow and reduce maintenance costs.
- Drainage systems: The project includes installing new drainage systems to reduce the risk of flooding and improve road safety.
Component | Description | Cost |
---|---|---|
Road widening | Adding new lanes to improve traffic flow | $100 million |
Interchange upgrades | Upgrading interchanges to improve safety and reduce congestion | $50 million |
Bridge construction | Constructing new bridges and rehabilitating existing ones | $200 million |
Drainage systems | Installing new drainage systems to reduce flooding and improve road safety | $20 million |

Technical Specifications

The Deerfoot Trail construction project involves a range of technical specifications, including:
The highway’s design speed is 100 km/h, with a maximum grade of 4% and a minimum curve radius of 1,200 meters. The road’s surface is designed to withstand a minimum of 10,000 vehicles per day, with a maximum axle load of 17,000 kg. The project’s drainage system is designed to handle a 10-year storm event, with a maximum flow rate of 100 cubic meters per second.
The project's materials and construction methods are designed to meet or exceed the relevant industry standards and regulations. The road's pavement is constructed using a combination of asphalt and concrete, with a minimum thickness of 200 mm. The bridges are designed using a combination of steel and concrete, with a minimum lifespan of 50 years.
Performance Analysis
The Deerfoot Trail construction project’s performance is being closely monitored and analyzed to ensure that it meets the required standards and specifications. The project’s progress is being tracked using a range of key performance indicators (KPIs), including:
- Construction schedule: The project’s schedule is being monitored to ensure that it is completed on time and within budget.
- Cost management: The project’s costs are being closely managed to ensure that they are within budget and aligned with the project’s scope and objectives.
- Quality control: The project’s quality is being closely monitored to ensure that it meets the required standards and specifications.
- Safety performance: The project’s safety performance is being closely monitored to ensure that it meets the required standards and regulations.
KPI | Target | Actual |
---|---|---|
Construction schedule | Complete by 2025 | On track |
Cost management | $500 million | $450 million |
Quality control | Meet or exceed industry standards | Exceeding industry standards |
Safety performance | Zero injuries or fatalities | Zero injuries or fatalities |
What is the purpose of the Deerfoot Trail construction project?
+The purpose of the Deerfoot Trail construction project is to improve traffic flow, reduce congestion, and enhance road safety on one of Calgary’s major highways.
What are the key components of the project?
+The key components of the project include road widening, interchange upgrades, bridge construction, and drainage systems.
What are the technical specifications of the project?
+The project’s technical specifications include a design speed of 100 km/h, a maximum grade of 4%, and a minimum curve radius of 1,200 meters. The road’s surface is designed to withstand a minimum of 10,000 vehicles per day, with a maximum axle load of 17,000 kg.